The Dalles US Gate Replacement

UPSTREAM GATE REPLACEMENT, CONTROLS UPGRADE, AND DOWNSTREAM GATE GUDGEON REPLACEMENT


The Dalles Navigational Lock Upstream Gate Replacement, Controls Upgrade, and Downstream Gate Gudgeon Replacement was awarded to Northbank on a best value basis. The entire Columbia and Snake River system was shut down from December 12, 2016 through March 20, 2017 to perform major repairs and upgrades at majority of the dams.


The upstream gate replacement consists of removal of the old upstream gate, fabrication and installation of a new upstream gate, replacement of the gate anchorage system, and replacement of the gate operating machinery and controls. The downstream gate work includes replacement of the gudgeons, quoin and miter block adjustments, diagonal tensioning, seal replacement, and installation of an impressed current cathodic protection system. The controls upgrade includes upgrades of the navigational lock’s control system and installation of a new power distribution system.


Northbank was able to complete the project on-time, even though the local area experienced the worst extended weather conditions in the past 25 years.

OWNER
US ARMY CORPS OF ENGINEERS, PORTLAND DISTRICT
LOCATION
DALLESPORT, WASHINGTON
YEAR
2016
JOB NUMBER
16-102

GALLERY

OTHER PROJECTS

WORK WITH US

For questions or bid inquiries please click below.

CONTACT US