Lucky Peak Maintenance Hoist

This Design-Build project required design, fabricate and installing dual hoist (15-TN each) wheeled trolley crane that runs on the existing emergency gate hoist rails. This project was completed fall of 2018.

OWNER
USACE, Walla Walla District
LOCATION
Boise, Idaho
YEAR
2017
JOB NUMBER
17-204