Detroit Dam Tainter Gate Rehabilitation
The work consists of the rehabilitation of 6 spillway gates. This includes structural strengthening of the gates, full replacement of the gate hoist equipment and replacement of the trunnion bearing systems. Other miscellaneous work includes replacing the switchgear, limit switches, lighting and gate control systems. Onsite work began in the fall of 2019 and is scheduled to be complete in early 2022.